FAQ

Frequently
Asked Questions

Quick answers to common questions about Title 24 testing.

What is Title 24 / HERS testing?
Title 24 field verification confirms that required energy-efficiency measures were installed and perform as specified for the project. The exact HERS or ECC tests depend on the permit and project documentation.
When do I need a HERS test?
HERS or ECC verification is commonly required when the permitted project includes measures that call for field verification. Send us the project address, permit year and available CF1R or plans and we can review what the project requires.
What do I need to provide before the test?
Start with the project address, permit year, contact information and any available CF1R, plans or permit documents. For multi-system projects, it also helps to identify how many indoor and outdoor units serve each dwelling or area.
How long does the testing take?
It depends on the required measures, number of systems and site readiness. A straightforward single-system verification may be relatively quick, while projects with multiple systems or several required tests take longer.
Do you test exhaust fans?
When mechanical ventilation or exhaust verification is required by the project documents, we can review the applicable scope and determine what field verification is needed.
Do you verify refrigerant charge?
Yes, when refrigerant charge verification is a required HERS/ECC measure for the installed system and project. The system must be installed, powered and operating under suitable test conditions.
What areas do you cover?
We serve the San Francisco Bay Area, including San Francisco, the Peninsula, Marin, Contra Costa, Alameda and Santa Clara counties. See the Service Area page for representative cities.
How will I receive the reports?
After the required field verification is completed, the project results and applicable documentation are processed through the appropriate Title 24/HERS workflow. We coordinate the next steps with the contractor, owner or project contact.
How much does it cost?
Pricing depends on the required verification measures, number of systems, project location and whether a return visit is needed. Send the project information and available documents for a project-specific quote.

Need Title 24 verification at your project?

Send the address and available project documents and we’ll review the next step.