What this verification covers
When is it required?
The answer comes from the project’s energy compliance documents and permit/code cycle. Not every project requires every HERS/ECC measure. Send the CF1R or available permit documents and we can identify the field verification scope before scheduling.
What to send us
- Project address
- CF1R / energy compliance documents
- Permit year or code cycle, if known
- HVAC equipment information and project status
What happens on site
- Confirm the project address, permit/code cycle, system scope and available CF1R documents before the visit.
- On site, the duct system is prepared for testing and measured with calibrated field equipment.
- Results are documented for the applicable verification workflow.