A Clear Field Verification Process

How It Works.

From the first project details to completed field verification, we keep the process straightforward and focused on what your job actually requires.

From Plans to Field Verification

Simple steps. No guesswork.

Every project is different. We review the available information first, identify the applicable verification scope, then coordinate the field visit around the project schedule.

STEP 01

Send the project information.

Start with the project address, permit year, contact information and any available plans, CF1R or permit documents.

STEP 02

We review the required verification.

We identify the HERS / ECC measures that apply to the project so you know what needs to be ready before the site visit.

STEP 03

Schedule the field visit.

We coordinate a practical appointment around the contractor, homeowner and active job-site schedule.

STEP 04

Complete field testing.

Required measurements and verification are performed on site using calibrated professional diagnostic equipment.

STEP 05

Resolve anything that needs attention.

If a system is not ready or a measurement needs correction, we explain what was found so the contractor can address it efficiently.

STEP 06

Complete the verification workflow.

Once the applicable measures pass, the project moves through the required documentation and registry workflow toward inspection closeout.

Before We Arrive

What to send us.

The more project information available up front, the easier it is to confirm the correct scope and avoid unnecessary return visits.

Not sure what testing is required?
Send what you have. We can review the project information before scheduling the field visit.
✓
Project addressFull job-site address and unit information, if applicable.
✓
Permit yearImportant for determining which California code cycle applies.
✓
CF1R / energy documentsSend the available compliance documents, plans or permit package.
✓
HVAC system informationEquipment type, number of systems and whether installation is complete and operational.
✓
Inspection timelineLet us know when the project needs to be ready for final inspection.
Professional Field Work

Prepared for the site visit.

Field verification is performed with professional diagnostic equipment appropriate to the required measure, including duct leakage, airflow, ventilation and applicable HVAC verification.

Professional Title 24 field verification equipment

Need Title 24 verification at your project?

Send the address and available project documents and we’ll review the next step.